A defined service approach

A public-main tap is not ordinary private piping work.

New service connections can involve utility applications, capacity review, fees, approved contractors, testing, traffic control, and inspections. Emerald’s role and any utility or specialty contractor work must be defined for the location before a connection is offered.

01

Utility requirements

Identify the main owner, approved application process, capacity, service size, materials, and connection responsibilities.

02

Site & scope coordination

Review route, utility conflicts, access, right-of-way, excavation, shutdowns, and the proposed sequence.

Explore service
03

Qualified execution & closeout

Confirm current authority and the party authorized to make the tap. Establish inspection, testing, and documentation requirements.

Before work begins

Clear information.
Better decisions.

Good intake helps separate the urgent symptom, the investigation, and the approved work.

  1. 01

    Property address and a contact who can authorize work

  2. 02

    Symptoms, photos, access restrictions, and previous service records

  3. 03

    Approved scope, scheduling, permits, and restoration responsibilities

Illustrative water-service connection work in a controlled work area
A closer look at the service

Follow the route.Plan every connection.

Private piping, public connections, and utility responsibilities must be separated. Plan access, approved materials, connection details, shutdowns, testing, and restoration for the specific route.

  • Property address and a contact who can authorize work
  • Symptoms, photos, access restrictions, and previous service records
  • Approved scope, scheduling, permits, and restoration responsibilities
Discuss Your Service
Useful questions

Set expectations
before the visit.

General information—not a substitute for the approved scope, equipment instructions, or governing requirements.

240.392.3535
Can Emerald tap any main in the DMV?

No blanket authority is claimed. The utility, jurisdiction, project, and current contractor qualifications determine who may perform each part of the work.

Will service remain on?

Shutdown and isolation requirements are determined during utility and technical review. Do not assume uninterrupted water service.

Are utility fees included?

Connection, capacity, inspection, application, traffic, and other fees must be identified in the specific proposal, with responsibilities stated.

Start a service conversation

Tell us what your property needs.

Share the symptoms, property address, access information, and any timing constraints. For an urgent problem, call directly.

Call for service240.392.3535
  • Scope and scheduling confirmed by property
  • Findings explained before additional work
  • No information is sent by this preview